A Review and a Case Study About Claim Management In Contracts During The Covid-19 Pandemic


Özet Görüntüleme: 88 / PDF İndirme: 50

Yazarlar

Anahtar Kelimeler:

COVID-19 , Mücbir Sebep, Aşırı İfa Güçlüğü , Hak Talebi, Gecikme Analizi

Özet

This study aims to review the obligations in the contracts, which the obligor were not actually responsible for prior to the COVID-19 that was proclaimed as a pandemic, but which became mandatory obligations after the pandemic, as well as the failure to fulfill the obligations for which the obligor was responsible due to the impossibilities and hardship provisions and/or failure to complete these obligations within the contract term and to discuss the claims to be made based on force majeure and hardship provisions in the contracts. Since it is important here is to ensure that the win-win principle is applied by demonstrating the negative impacts mutually suffered by the contracting parties and protecting their mutual interests equally, it is essential to share the risk posed by the pandemic equally between the contracting parties. The method to be used to ensure such equal distribution is possible by determining it separately according to the characteristics of each concrete contractual relationship. This study aims to explain the force majeure or hardship provisions in contracts that cause impossibility of fulfillment of obligations due to the pandemic and the solutions that could be applied to solve the negative impacts on the contracting parties and the relationship of these practices with sustainability.

Referanslar

Al Amri, T., & Marey-Pérez, M. (2020). Impact of Covid-19 on Oman's construction industry. Technium Social Sciences Journal, 9. https://doi.org/10.47577/tssj.v9i1.1021

Alenezi, T. A. N. (2020). The impact of COVID-19 on construction projects in Kuwait. International Journal of Engineering Research and General Science, ISSN 2091-2730. https://oaji.net/articles/2020/786-1598497628.pdf

AYBAY, E. M. (2014). Sözleşmenin değişen koşullara uyarlanması. TBB Dergisi. https://dergipark.org.tr/tr/download/article-file/333499

Aziz, A. A., & Shen, T. L. (2016). Management of force majeure risks in Canadian PPP transportation projects. In Construction Research Congress 2016. https://doi.org/10.1061/9780784479827.055

Ezeldin, S., & Abu Helw, A. (2018). Proposed force majeure clause for construction contracts under civil and common laws. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10, Article 04518005. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000255

Kolcuoğlu Demir Koçaklı. (2020, March). Coronavirus: An evaluation of possible legal consequences of the pandemic and related practices. Law Bulletin. https://www.kolcuoglu.av.tr/Uploads/Publication/coronavirusanevaluationofpossiblelegalconsequencesofthepandemicandrelatedpractices.pdf

Özçelik, Ş. B. (2016). Kamu ihale sözleşmeleri kanunu’na göre mücbir sebepler ve sonuçları. Barolar Birliği Dergisi. https://tbbdergisi.barobirlik.org.tr/m2016-123-1563

Özyegin, E. (2020). Hardship clauses and modification of contracts in light of COVID-19. Neziroğlu Law. https://www.mondaq.com/turkey/contracts-and-commercial-law/949934/hardship-clauses-and-modification-of-contracts-in-light-of-covid-19

Public Procurement Law No. 4734.

Sayılı Cumhurbaşkanlığı Genelgesi (2020/5). (2020, April 2). Resmî Gazete, 31087. https://hukukmusavirligi.diyanet.gov.tr/Documents/2020-5%20nolu%20CB%20Genelgesi.pdf

Turkish Code of Obligations No. 6098.

Tüzüner, Ö., & Öz, K. (2015). Aşırı ifa güçlüğüne ilişkin içtihat incelemesi. Ankara Barosu Dergisi. https://dergipark.org.tr/tr/download/article-file/398591

Yadeta, A. E. (2020). Analysis of the global impact of the pandemic (COVID-19) on construction industry: Possible scenarios. Current Trends in Civil & Structural Engineering, October 2020. https://irispublishers.com/ctcse/pdf/CTCSE.MS.ID.000641.pdf

Yavuz, E., & Uyanık, A. (n.d.). Koronavirüs 2019 (COVID-19) ve sözleşmeler. https://yavuz-uyanik.av.tr/haber-ve-yayin

Yayınlanmış

2025-06-21

Nasıl Atıf Yapılır

Canbal Vedi, A. (2025). A Review and a Case Study About Claim Management In Contracts During The Covid-19 Pandemic. Journal of Recycling Economy & Sustainability Policy, 4(1), 112–125. Geliş tarihi gönderen https://www.respjournal.com/index.php/pub/article/view/65